Next Generation Energy Design Solutions

Projects

Featured Project

Dearborn HVAC Infrastructure & Energy Initiative

In 2016, the City of Dearborn, Michigan, launched an initiative to turn its 80-acre building complex across from the Ford World Headquarters into a world-class, energy-efficient, sustainable municipal campus. The project included upgrading HVAC, chilled and hot water heating systems, electric infrastructure, and other energy-consuming systems to the most current technology in six key buildings.

Millenium Energy Company worked with Larkin Engineering to develop a long-term energy-savings infrastructure plan. Millenium’s E~flow control system was selected to convert all heating and cooling systems from constant volume to variable flow based on building system demand.

ELECTRIC SAVINGS: 4M KILOWATT HOURS
ENERGY SAVINGS: $600K PER YEAR

Oakland University

Oakland County, MI

Restoring system operation, repairing, and re-commissioning meters for the entire metering system, which is connected to the campus building automation system

  • ~3 million sq. ft. campus
  • Metering system has 140 electric, BTU, and gas meters throughout the campus used for billing departments

United Parcel Service

Detroit & Toledo

New Lighting in all Detroit Metro buildings: 1 million+ square feet

UPS Toledo Hub: 350,000 square feet

Bloomfield Schools

Oakland County, MI

Commissioning of new building with heat pump system

Eaton Rapids Schools

Eaton Rapids, MI

Developed a Strategic Energy Plan for ERPC:

  • Conducted energy audits for 8 buildings totaling over 600,000 square feet, including lighting, energy cost, boiler and heating systems, ventilation systems, energy management systems including automated HVAC and lighting controls
  • Developed project cost analyses, and an energy model for the district, including calculated savings from energy-related upgrades
  • Reviewed renewable energy options
  • Reviewed options for financing and implementation

Oakland ISD

Oakland County, MI

Energy Consultant:

  • Re-commissioning of existing Administration Building
  • Pre-commissioning and consulting services for new construction of four Tech Center campuses
  • Providing energy-consulting services for other Oakland County school districts

Haslett Schools

Haslett, MI

Designed and managed the installation of:

  • The District-wide EMS for 8 buildings (System Integration) totaling approximately 600,000 square feet
  • Upgrade of T8 lighting systems in 8 buildings,
  • Conversion of HVAC units to DDC
  • Installation of variable speed motors and building occupancy-determined control

PROJECT COST: $500,000
ESTIMATED SAVINGS: >$100,000

Ingham ISD

Mason, MI

Designed and managed the installation of:

  • The District-wide EMS for 3 buildings (Alerton System) totaling approximately 300,000 square feet
  • New boilers in 2 buildings
  • Upgrade of T8 lighting systems in 3 buildings

PROJECT COST: $600,000
ESTIMATED SAVINGS: >$150,000

St. Johns Schools

St. Johns, MI

Designed and managed the installation of:

  • The District-wide EMS for 10 buildings (Siemens System) totaling approximately 600,000 square feet
  • New boilers in the High School and 4 elementary schools
  • Installing new transformer at the Middle School and upgrading to Primary Rate, 4) Retrofitting entire District to T8 lighting system

FINANCING: Michigan Energy Bonds
PROJECT COST: $1,100,000
ESTIMATED SAVINGS: >$150,000

 

Okemos Public Schools

Okemos, MI

Designed and managed the installation of:

  • The District-wide EMS for 10 buildings (Trane Summit System) totaling approximately 1 million square feet,
  • Retrofit of entire District to T8 lighting system,
  • Converting two schools from steam to hot water heating and installation of new boilers.

FINANCING: Michigan Energy Bonds
PROJECT COST: $2,512,736
ESTIMATED SAVINGS: >$500,000