Featured Project
Dearborn HVAC Infrastructure & Energy Initiative
In 2016, the City of Dearborn, Michigan, launched an initiative to turn its 80-acre building complex across from the Ford World Headquarters into a world-class, energy-efficient, sustainable municipal campus. The project included upgrading HVAC, chilled and hot water heating systems, electric infrastructure, and other energy-consuming systems to the most current technology in six key buildings.
Millenium Energy Company worked with Larkin Engineering to develop a long-term energy-savings infrastructure plan. Millenium’s E~flow control system was selected to convert all heating and cooling systems from constant volume to variable flow based on building system demand.
ELECTRIC SAVINGS: 4M KILOWATT HOURS
ENERGY SAVINGS: $600K PER YEAR
Oakland University
Oakland County, MI
Restoring system operation, repairing, and re-commissioning meters for the entire metering system, which is connected to the campus building automation system
- ~3 million sq. ft. campus
- Metering system has 140 electric, BTU, and gas meters throughout the campus used for billing departments
United Parcel Service
Detroit & Toledo
New Lighting in all Detroit Metro buildings: 1 million+ square feet
UPS Toledo Hub: 350,000 square feet
Bloomfield Schools
Oakland County, MI
Commissioning of new building with heat pump system
Eaton Rapids Schools
Eaton Rapids, MI
Developed a Strategic Energy Plan for ERPC:
- Conducted energy audits for 8 buildings totaling over 600,000 square feet, including lighting, energy cost, boiler and heating systems, ventilation systems, energy management systems including automated HVAC and lighting controls
- Developed project cost analyses, and an energy model for the district, including calculated savings from energy-related upgrades
- Reviewed renewable energy options
- Reviewed options for financing and implementation
Oakland ISD
Oakland County, MI
Energy Consultant:
- Re-commissioning of existing Administration Building
- Pre-commissioning and consulting services for new construction of four Tech Center campuses
- Providing energy-consulting services for other Oakland County school districts
Haslett Schools
Haslett, MI
Designed and managed the installation of:
- The District-wide EMS for 8 buildings (System Integration) totaling approximately 600,000 square feet
- Upgrade of T8 lighting systems in 8 buildings,
- Conversion of HVAC units to DDC
- Installation of variable speed motors and building occupancy-determined control
PROJECT COST: $500,000
ESTIMATED SAVINGS: >$100,000
Ingham ISD
Mason, MI
Designed and managed the installation of:
- The District-wide EMS for 3 buildings (Alerton System) totaling approximately 300,000 square feet
- New boilers in 2 buildings
- Upgrade of T8 lighting systems in 3 buildings
PROJECT COST: $600,000
ESTIMATED SAVINGS: >$150,000
St. Johns Schools
St. Johns, MI
Designed and managed the installation of:
- The District-wide EMS for 10 buildings (Siemens System) totaling approximately 600,000 square feet
- New boilers in the High School and 4 elementary schools
- Installing new transformer at the Middle School and upgrading to Primary Rate, 4) Retrofitting entire District to T8 lighting system
FINANCING: Michigan Energy Bonds
PROJECT COST: $1,100,000
ESTIMATED SAVINGS: >$150,000
Okemos Public Schools
Okemos, MI
Designed and managed the installation of:
- The District-wide EMS for 10 buildings (Trane Summit System) totaling approximately 1 million square feet,
- Retrofit of entire District to T8 lighting system,
- Converting two schools from steam to hot water heating and installation of new boilers.
FINANCING: Michigan Energy Bonds
PROJECT COST: $2,512,736
ESTIMATED SAVINGS: >$500,000